INPUTS
users
0 = All users start concurrently
Users are distributed across scenarios based on iteration time.
Users ∝ 1 / Iteration Time (faster scenarios get more users)
SCENARIOS (4)
S.No. Scenario Name Iteration Time (sec) Actions
WORKLOAD SUMMARY
Total Users
200
users
Total TPS
138.3
req/s
Total Requests
496,800
requests
Test Duration
60
Minutes (3,600 sec)
Ramp-up time: 10 Minutes (Users will be gradually increased to full load)
WORKLOAD DISTRIBUTION
S.No. Scenario Iteration Time (sec) Users % of Users TPS (req/s) Total Requests
RAMP-UP MODEL
Ramp-up Time 10 Minutes
Ramp-up Type Linear
Start Users 0 users
End Users 200 users
User Ramp-up Over Time
200 100 0
0 min 10 min 60 min
Users
Users will be gradually increased from 0 to 200 over 10 minutes, then remain steady till the end of the test.
DISTRIBUTION METHOD
Users are distributed using the formula:
Usersi = Total Users × ( 1 / Iteration Timei ∑ 1 / Iteration Timei )
Where,
Iteration Time = Iteration Time (sec) + Think Time (sec)
CALCULATION FORMULAS
  • Weighti = 1 / Iteration Timei
  • Usersi = Total Users × ( Weighti / ∑ Weight )
  • TPSi = Usersi / Iteration Timei
  • Total TPS = ∑ TPSi
  • Total Requestsi = TPSi × Total Duration (sec)
  • Total Requests = ∑ Total Requestsi